An empty garage, a fresh slab, no boxes to move — the week before move-in is the easiest floor coating we ever do. Here's what to check first and why builder-grade concrete needs it.

Builder slabs are poured fast and finished fast. They dust, they have shrinkage cracks by the first winter, and they've never been sealed. The first salt season starts the pitting. Coating a new slab freezes it in its best condition.
Concrete needs about 28 days before it can be coated. If you're closing on a house that was poured months ago, you're fine. If the slab is brand new, we'll schedule accordingly.
Many builders spray a curing compound on fresh slabs. It has to be ground off — which we do anyway. It's the reason a DIY kit on a new slab often fails within a year.
Answer a few questions about the space — size, condition, the finish you like — and our instant quote tool builds a written price on the spot. It takes four to five minutes, not sixty seconds, because an accurate number beats a fast one. Prefer a person? Book a free consultation and we'll measure in person.
Trouble loading? Open the instant quote in a new tab.
Get an instant online price in a few minutes, or book a free in-person consultation. No pressure, no sleazy sales pitch — just a written price.
